10th March 2006, 10:11 PM
Quote:quote:Originally posted by monitor lizard
But then you run the real risk of a different contractor picking up the post-ex, which is a nightmare.
I'm sure, but then at least the post ex would be funded, and the developer made to realize that it HAD to be done.