27th September 2013, 06:47 PM
The report should be costed separately with a minimum set that includes the basics for a site with nowt of much interest. Everything on top of that would be according to what is anticipated factoring in specialist reports or as a day rate. The client might not see this break down but surely it should be there in your project design?