7th January 2013, 04:57 PM
I think we really do need a national standard for everything. Had a visit from a client today, they're evaluating a site which straddles a county boundary. On one side of the site, they're doing a 5% sample on the other 1% - the developer is utterly baffled as to why they're not required to do the same sample level on both sides. He's not the only one.
\"Whoever understands the pottery, understands the site\" - Wheeler